Monday, May 30, 2022

Day 57

This weekend, Harbor Freight ran their highly-anticipated 20 percent off coupon, and today - Memorial Day - they had a one-day 25 percent off coupon. Since I won't have access to my dad's band saw once I relocate to Pine, I decided to pick one up...at a nicely discounted price!


 

 

 

 

 

 

 

 

 

 

 

 

 

 

Once I got to the trailer, the first task was to tear into that rear ceiling area and get it ready for boards. I carefully cut a straight line with the oscillating multi-tool, pulled the panels out and removed the old insulation:











 

With that done, I checked around the trailer for any odd jobs I could complete today. I went with closing the wall gap to the right of the door. It was a good first job for the band saw. Before:














 

I used the band saw to make both the rip cuts and cross cuts on this piece, and to cut out the notch. Very handy:














 

First piece installed beside the door:














 

After a quick brunch, I cut one more piece to fit below:














 

I just need to cut another length to reach the floor, then finish it with a nice corner trim to conceal that gap.

So...I'm already feeling like that band saw is going to turn out to be one of the most useful tools in my collection. I'm so glad I picked it up!

The forecast for next weekend is in the low 100s. So - other than some last minute prep for moving - this is probably it until the trailer lives in Pine. We've pretty much settled on June 12, so it's not too much longer anyway.

Sunday, May 29, 2022

Day 56

Today was small task day - no big projects. The weather for today and tomorrow is in the mid 90s, so I feel like I've been gifted some extra time.

I didn't bother to get pics of all the small tasks. Like re-attaching some of the plastic cabinet trim with small nails, using steel wool to clean up the metal frames of windows, etc. But I did want to note the addition of some primed wood trim over the front shelf. I bought a piece from Home Depot, and cut it to the width of the top of the shelf - 90 inches. But when I tried to test-fit, I couldn't maneuver the piece into place because of the side cabinets. So I settled on cutting to two 45 inch lengths:














 

First piece installed:











 

Both pieces needed to be notched to fit around the side lip on each end of the shelf. Easy enough with my dad's band saw:











 

The second piece in place. Now I just need some trim pieces for the sides, and the shelf will be ready for paint.











 

The only drawback to installing that "step" on the ceiling about a week ago, was that - since the wood doesn't go the full width of the trailer in that area - it left a gap...big enough to see the insulation behind:











 

I selected a piece of scrap wall paneling and had dad trim it down with his radial arm saw:











 

A little filing and sanding, and it was good to go! Just had to pre-drill the holes and use really small nails:











 

Tomorrow, I'd like to trim that back ceiling where I'm installing more boards, so I marked the line today:














 

And of course, more demolition work on the rotted lower back wall:











 

Work continues tomorrow, although I am stopping at Harbor Freight on the way over to pick something up.

Friday, May 27, 2022

Day 55

We're officially in the 100's with the heat. It was already going to be a short morning due to me heading up to Pine, but I wanted to tear out that lower back wall. Ugh. I knew it wasn't going to be good:











 

Between all of the rotted wall board and the fiberglass insulation, I nearly filled up the garbage bin. It's still going to take some work. What little frame boards that are here are mostly rotted. I'm going to have to put in a simple frame to attach the new wall to. This compartment was once accessible from the outside, but is now closed off by a sheet of plywood screwed into place...which is also warping, because it was never protected from the weather. That will also have to be replaced.

The compartment is pretty shallow, so it must have been intended for storage of flat items - folding chairs, tables, etc. If I can find something that can be used as a weatherproof hatch, I might install it once the new plywood is in place.



Monday, May 23, 2022

Day 54

I skipped a day to made a quick trip to Pine and back, but this morning I was able to complete the ceiling (with the exception of that back corner with the vent dome). 

I'm starting to get a "cabin" feel in here!



Saturday, May 21, 2022

Day 53

Before putting any boards up, I had to add an extension to the ceiling stud, so the boards would have something to attach to. I used the rest of that length of hardwood from a recent Home Depot trip:











 

To compensate for the slope of the ceiling, I decided to add a board to act as a "step" so the ceiling outside of the shelf will be close to the levelness of the ceiling inside:











 

Starting to install boards over the "step"...


 

 

 

 

 

 

 

 

 

 

Closing in on being done with this section of the ceiling. One more day...


 

Friday, May 20, 2022

Day 52

To finish up the ceiling in the shelf area, I needed to install a piece of wood to make it level:











 

First board with insulation in:











 

A lot of cutting and notching happened between these two photos. For the two boards that meet with the post on the right, I had to do some band saw magic, but everything came together okay:


 

 

 

 

 

 

 

 

 

 

I moved over to the area over the door to do a little more work before calling it a day:


 










Tomorrow, I'm going to see if I can finish up the ceiling in this area. Time is getting short...

Monday, May 16, 2022

Day 51

Another short morning. I installed three more rows of ceiling boards...











 

...then switched to finishing up the last wall panel in the new shelf area. Two quick cuts with the circular saw and a small notch with the jigsaw:











 

Insulation and board installed:




















 

On Friday I'll get to work on installing the ceiling boards here. Once that is complete, I just need to get another plywood sheet for the right side to finish this up.

Saturday, May 14, 2022

Day 50

Fifty days of work on this beast...

Since my folks aren't keen on me running any loud tools before 8am (because of neighbors), I spent most of the morning cleaning and organizing the chaos of the trailer, then took a trip to Home Depot to get a piece of wood for the task mentioned in yesterday's entry. Also, I got a long enough piece of 2" trim for the top edge of the forward shelf. Not much wood for a $30+ purchase, but the times are what they are.

Wood strip installed. This will give me another surface to screw into:











 

I managed to cut and install one more board before the heat started making things uncomfortable. Around 9am, the trailer was already in the low 90s (with fan on and windows open), so when we took a break for brunch, I packed everything up for the day. Tomorrow is hotter, so once again I'm skipping a day. With the short amount of actual work time I have on the hottest days, it's not worth the gas I'm using to drive over here.











 

After brunch, I worked on updating my mom's Mac for a while. When I left for Tempe, the temperature  inside the trailer was 111 degrees. Ooof...

I'll be back on Monday, which is supposed to be a little cooler.

Friday, May 13, 2022

Day 49

I was delighted to see that the second shipment of Havelock Wool had arrived!














 

I started working on the demo of the forward ceiling. I used a carpenter's square to get a straight line, and cut - very slowly - with the oscillating multi-tool:











 

I free-hand cut some lines within that square to make it easier to remove. Old insulation out in the first area:











 

Second area removed - I took the pic before pulling down the old insulation:











 

Final area and insulation removed. Also, those wires have got to go. The view facing forward from the center of the trailer:











 

In order to start installing ceiling boards, I needed to work from a wall, which meant putting in the "wall" over the door. Starting with the two backing boards (to allow room for the new insulation behind)...




















 

The two wall boards - with new insulation - installed. The original upper board had a slight twist, and I fought with it for a while to make it fit properly, but I finally started over with a new board.











 

With only one "stud" on the ceiling, the area over the door was going to need a second board to be able to run screws into, so I found a piece that fit, and used dad's drill press to pre-drill the holes, then attached it to the stud:











 

First ceiling board in. Looking good so far...











 

Number two:











 

The third board had to be cut to fit around the top of the cabinet, so I used the bandsaw to cut, then fine-tuned it with a file. Also, the cabinet door had to first be removed in order to cut away some of the old ceiling board that was in the way:


 

 

 

 

 

 

 

 

 

 

Once again, I need another anchor point to put screws into, so I'll have to get another board and attach it to the forward stud. It'll have to wait until tomorrow morning...because heat.


 

Monday, May 9, 2022

Day 48

This board had to be cut to fit around the top edge of the closet. Dad initially ran it through the band saw, but my measurements were slightly off, so I ended up shaving off more with a hand planer and rasp. Neatened it up a bit with files and sanding:























 

Finished! The final board was a piece of scrap plywood that only needed a little trimming to fit. It didn't look like the others, so I added it just for fun:











 

I didn't have a lot of time left, so instead of starting another ceiling area, I wanted to work on something I knew I could finish up. I'd picked up a strip of primed wood a while back. This seemed like a good time to work on that forward shelf.

I started by shaving the edge with a hand planer, then sanding the front and top to even everything up.




















 

Front trim added. It's ready for paint. I still need to get some taller trim for that top edge, as well as decide what to do with that wall. Paint? Wallpaper? Choices...




















 

I need to place another order for more Havelock wool, as there are only two batts left. It would be perfect timing for it to be here by next weekend!