Wednesday, August 31, 2022

Day 88

Last weekend's festivities took a lot of prep and also took a lot out of me, so Sunday was mostly a rest day before heading back to the valley.

After spending Monday and Tuesday in Tempe, I headed back to Pine on Wednesday, after a morning visit with the folks. The weather was (finally) supposed to be drying out, with very little chance for rain over the next few days, so I pulled off the tarp and got to work on painting the roof with Liquid Rubber.











 

I stuck to painting over all of the seams and patches, basically anywhere that moisture could possibly get in. Because there isn't much room to maneuver around the trailer on most sides, I was starting to contemplate ways to get to the hard-to-reach spots. Sooz mentioned making an extension for the foam brushes I was using - great idea! So I whipped this up:















 

It worked beautifully.

In addition to the Liquid Rubber, I also applied Dicor sealant around any areas on the outside that I may have missed. The evening was approaching, and I knew I had to be fully rested for the work on the farm in the morning, so I called it a day.

Monday, August 22, 2022

Day 87

There was a lot to do today, so it was a short morning. I did get a couple of boards cut, planed, sanded and oiled. I also added a second backing board below.
























 

That's it. I'm back in Pine on Thursday, but we'll be prepping for Saturday, which is International Play Music on the Porch Day, and we're having a bunch of people over for some jamming and pizza! Hopefully, I'll get to do a little work before then, and then a lot more on Sunday.

Sunday, August 21, 2022

Day 86

I hung the forward cabinet door on the kitchen side. This area is starting to come together:











 

The trim pieces that I painted a while back are finally mounted. I still need to do a little touch-up painting on them, but I think they look good:









 

Another coat for the closet. I forgot to mention that I also hit that inside edge with Black Truffle to match the cabinet edges:














 

Second coats on the closet door and drawers:










 

By this time, the clouds started approaching, with lots of thunder to announce their arrival. I checked the weather app, and rain was on it's way for sure. I wasn't ready to quit for the day, so I spent another hour or so doing some much-needed cleaning and organizing in the trailer.

Saturday, August 20, 2022

Day 85

The closet door is now in play:














 

...and I put down the first coat on the front of the closet itself. I like this Burgundy red, but - like the other colors on this project - it goes on pretty thin, so quite a few coats are needed:














 

More yellow in the forward shelf nooks. I just wanted to brighten these areas a little:












 

Firecracker red on the closet door!











 

First coats on the drawers. I'm grateful for the sunshine to help with the drying:


 

 

 

 

 

 

 

 

 

 

I took a short break from painting to finish up the dome frame with some screws:


 









 

The yellow strips on either side of the kitchen cabinets just looked a little too "kid's bedroom" to me, so I went over them with the Black Truffle. Better, I reckon:











 

Shifting gears for the afternoon, I started cutting and planing boards for the other side of the shelf tower between the door and the stove. Oiling and placing the first one:










 

I got three boards down - and thought I was making really good time - then I realized that I had forgotten about that little outward slope in the trailer wall...which was throwing off my measurements.


 

 

 

 

 

 

 

 

 

 

So the next few boards had to have the edge that meets the wall cut at a very slight angle - which I got by using a bevel angle finder - then I had to taper them a bit, with the thinner end toward the center of the trailer, so they would eventually level out. This was done free-hand on the band saw. Pain in the ass, honestly, but it worked:














 

I got nearly halfway done with the wall, when the light started going. With the exception of a short lunch break, I'd been at for around 12 hours. So I showered and rewarded myself with a very tasty IPA.

Oh also...I'm running low on fence boards long enough to use for this area, so I'm going to have to use shorter ones. Which means having a backing board in the center to attach them to. I cut one from scrap and placed it before quitting for the day:



Friday, August 19, 2022

Day 84

I visited my folks before heading up to Pine, and while there, my dad and I worked on getting my grinder/wire wheel set-up working. No problem with the grinder side, but the wire wheel needed an improvised adapter to make it work with the unit. I was finally able to use it, so in Pine, I got to work on the cabinet hardware that I'd removed weeks ago.

In addition to stripping off the white paint that the buffoon had left on the hinges, the wheel also "de-brassed" the finish...which is fine by me. Not a fan of the brass look.














 

Shiny happy hardware! (You're welcome for the earworm...)











 

Reattaching the hardware:











 

The "kitchen" cabinets in place, with magnetic latches reattached:











 

It was - as Dylan once said - gettin' dark, too dark to see, and we had dinner to make, so the work shall continue in the morning.

Sunday, August 14, 2022

Day 83

Test-fitting the first board that I cut, planed and sanded:











 

I'm oiling the boards before I install them this time!











 

First board in place:











 

The old frame was white, which isn't really going to work with everything else, so I sprayed it flat black:




















 

I want to give the paint enough time to cure, so I'm just going to install it later.

Meanwhile, the boards were coming along nicely:









 

The last two in place. I'm happy with the way it turned out. This is the first time in a long while that I've started something on the trailer, and had the satisfaction of seeing it finished.









 

The next day, I had to make a run to the landfill and head back down to the valley, so...to be continued.

Saturday, August 13, 2022

Day 82

It's supposed to be a rainy weekend...









 

Soon after I arrived, it did start raining. Since nothing big happened on Friday, most of this post is from Saturday. Though I did start painting the ceiling:









 

Whenever I couldn't be outside, I worked inside, mostly on painting various areas: the backs of cabinet doors, building up coats on cabinets, the ceiling, etc.









 

I recalled seeing that Harbor Freight had 11'x19' tarps on sale for $20. We also needed some wild bird seed, so I had to reasons to justify a trip down to Payson. The old green tarp was doing an admirable job, but it wasn't big enough to cover the whole roof. Hopefully this will help with the leaks until I can get the roof coated.









 

Sooz and I had been talking about the area around the forward ceiling dome. Even though my dad sealed it up pretty well, it must have leaked long before that, because the ceiling material was wrinkled around it:


 

 

 

 

 

 

 

 

 

We both agreed it might be best for me to just cut out the ceiling around the dome and just frame it with wood panels. So today was the day to start choppin'...


 







 

 

I'm really good at destroying stuff!











 

 

Instead of removing the existing insulation, I just pushed it back into the ceiling cavity to make room for the Havelock wool:


 

 

 

 

 

 

 

 

 

More coats on the forward ceiling:


 







 

 

Tomorrow, I should be able to tackle the wood panels for this area.

Sunday, August 7, 2022

Day 81

I spent a little time figuring out the height of the nook, and how I was going to construct the framework around the compartment. As with many parts of this interior, I've never had to build something like this, so I'm thinking it up as I go.

Floor insulation cut and placed:









 

The next step would be the back wall of the compartment. I didn't have a single sheet of plywood big enough to span the nearly 90 inch width, so I would have to cut up smaller pieces to fit. I cut the first piece down with the circular saw. Before I could place it, we had more rain.

After the rain passed, I came out to continue work, but noticed that a small spot of that insulation was moist. The roof sealant was being delivered to an Amazon locker down in Tempe, so I'll have it by next weekend.

Once again, work comes to a halt.

Saturday, August 6, 2022

Day 80

Starting off the day with oiling. Finally getting to the area around the vent dome:











 

Meanwhile, Sooz was kind enough to start painting the cabinet doors that I removed:











 

I oiled a few more boards inside, and took the wooden hanger off the closet door for oiling (which you can sort of see in the photo below). After Sooz finished with the cabinet doors, she used up the last of her paint on a preliminary coat for the closet door, and to mark other spots to be painted red.



 

 

 

 

 

 

 

 

 

 

 

 

The day was turning hot, but perfect paint-drying weather!











 

We took a lunch break, after which I started planning out the frame for the "nook" on the back wall. The first step was to finish cleaning out all of the old insulation and rubble on the bottom. I had to use to pieces of stiff cardboard in either hand to scrape together and remove the last of the insulation. Scattered among it was dirt, bits of rotted wood, and what appeared to be more rodent droppings.

Finally cleared:









 

Cutting up 2x4s for the bottom of the frame:









 

And the sides, I used more cut down pieces from that library shelf:









 

By the time I got this far, I was running out of day, so I called it.