Sunday, June 26, 2022

Day 64

Finishing the deck was first up this morning. I eventually got around to adding crushed gravel under the bricks and tamping it down to make it more stable. Already we'd had some rain, and more was on the way...












 I got to work on planing and cutting the new batch of fence boards to finish up the ceiling, which took a good part of the day. First ones in place:















 

With the afternoon, the rain clouds rolled in. And before long, work came to a halt in the downpour. Even with the various tools under the cover of the carport, the slightest breeze can deposit droplets on them, so I called it a day, covered all of my tools and just enjoyed the rain.



Saturday, June 25, 2022

Day 63

With all of the traffic in and out of the trailer, I needed to have a sturdy "deck" outside. I did find a decent heavy wood pallet next to a dumpster in Payson, but I wanted to reinforce it.












We had some leftover pallets on the property from when the bricks were delivered for the retaining walls that I built a couple of years ago. I thought it might be nice to add this weathered wood to the top of my pallet for a rustic look.












Cutting and placing the wood. At some point during this process, I had to run to the hardware store in Pine to grab some weather-resistant deck screws.












Further along...











 

It was creeping up on the late afternoon. I decided to finish the deck in the morning, because Sooz and I wanted to go show our support at a Pride gathering in Pine.

One shot of the temporary "workshop" area of the carport!



Saturday, June 18, 2022

Day 62

I began work on finishing the ceiling in the back corner of the trailer, but after the first board was placed, I realized that I wouldn't have enough smaller fence boards to complete the job.












 

I briefly considered switching to the larger fence boards that are reserved for the walls. I did install one, but it just didn't look right, so I took it down.












I knew that my folks had some more of the smaller boards at their place, so I decided to pause the ceiling work until I could get them.

Cutting, planing and sanding those ceiling boards used up a big chunk of the day, so I spent the remainder of the time finishing up the "frame" on the right side of the door.



Friday, June 17, 2022

Day 61

I arrived in Pine a few days after the trailer was moved. Taking a moment in the morning to inspect and appreciate...











 

My first morning coffee in the trailer. Pondering next steps...












 

The clamp rig seems to have successfully prevented the stove from sliding around in transit:











 

The first issue that became apparent: because of the proximity to the carport, the trailer door can't be opened all the way. The Shasta can't be moved any further from the carport without risking being too close to a power pole. After some discussion, it was agreed that a notch cut in the side of the carport to allow the door to open halfway would be a good compromise. I went to work with the oscillating multi-tool and the cut-off tool...












 

I got the jack stands in place, and leveled her out to the best of my abilities.











 

Taking a short rest. Still much to do!



Monday, June 13, 2022

Day 60

60 days in, and here we are: moving day.


 

 

 

 

 

 

 

 

 

I'm back in Phoenix to see the trailer off - (sadly, I can't follow. I have work tonight, and for the next three days). 

We made arrangements for JR to come pick up the Beast with his big, fancy diesel truck. I arrived before the real heat hit, and started working on moving everything off the shelves to the floor:














 

Finally, the hitched trailer...Northbound!









 

Phase Two to start this weekend...

Saturday, June 11, 2022

Day 59

Sooz and I got to Home Depot in Payson before they opened, in the hopes of renting a small skid loader. The two small ones they had were both rented out, but due back this morning. After breakfast, we checked back and found that one had just been returned. We also had to rent a van to haul it, because it's more weight than my Tacoma can handle.











 

So began the attack on the pile of rock and dirt that would eventually be used to level my trailer parking spot, as well as other parts of the property.











 

Once the controls were figured out, I took to it pretty quickly!











 

Sooz and our neighbor Rick took turns as well. We spent the rest of the day, alternating between driving the skid loader and raking/shoveling rock.

The finished product:











 

Ready for the trailer!

Friday, June 10, 2022

Day 58

The oppressive summer heat has gripped the valley, and work has halted on the trailer...for now.

If all goes as planned, the Shasta will be moved to Pine on Monday. But this morning - before my trip to Pine to level my parking space - I'm dismantling a wood library shelf that was given to me by our branch manager. It had been employed in our Friend's of The Library area, but it was deemed unsafe, as one of the shelves was not properly attached, and the whole thing was not anchored to the wall. I guess it's much easier to get new things than fix old things.

Anyway, my dad and I spent a bet of the hot morning taking the back off of it with a circular saw - this thing was actually glued together, then reinforced with screws. The back wall - to the left in the photo below, is actually 3/4" plywood. Very sturdy. I might be able to use parts or all of it for my desk area.

I'm loading the back into the truck to take with me today, but the rest of it stays until we can further dismantle it.