Friday, February 18, 2022

Day 19

Due to a shortage of time, today was a light day. I decided to catch up on some smaller tasks. The magnetic cabinet door catches arrived this week, so I got to work on installing those in the "kitchen" cabinets...











 

...and in the rear cabinets on the opposite side.














 

The front-most cabinets have doors that swing up, but the handles were installed off to one side. It was bothering me a bit, visually, so I reinstalled them in the center. Holes will be patched, obviously.












 

Once I get all of the pipes yanked out of here, I'm splitting this space into an upper and lower, divided by a shelf. The lower will house Ruby's litter box, and the upper will be a space for the Jackery power station.











 

While I was doing all of this, dad was sizing and cutting a small piece of wood to give us a foundation for screws to seal the round opening in the roof. Unfortunately, I forgot to get an "after" picture of the installed wood piece. Next time!











 

Update: the "after" pic: