Thanks to a connection from Sooz, I was hooked up with some free firewood from someone in Phoenix. There was an enormous pile, and I wish I could have grabbed more, but I didn't want to overload my truck. I'll be unloading and merging it with our supply this weekend:
Since my Payson client chose to skip this week, after a short visit, I headed up to Pine. After a quick re-heat of leftovers, I got to work, cutting down and mounting the second half of the lower front wall. It's rough, and needs a little trim along the top edge, but at least now that area is insulated and (mostly) closed up. I just need to build out my desk:
In an effort to retire the circular saw and table saw to the shed for the season, I wanted to finish up the only other area that involved cutting plywood - the space between the counters. Before placing the panel on the floor, I put in supports to raise it to be flush with the front edge, and also to give space for insulation underneath:
Insulation and board in. I placed two trim boards on the sides to cover gaps. Everything is so crooked, but I'm just letting it go at this point:
That was it for the construction today. Everything else was unpacking clothes, household stuff, etc. Tomorrow is pretty booked, so perhaps Friday I'll get some more work in.