The roof exit kit arrived!
The 3" flue passes through a shorter 5" insulated pipe, which goes through the roof. We had to leave a 1" gap around the 5" pipe, so we started with a 4" cutting bit on the drill, and enlarged it to a 7" hole with tin snips.
After trimming off the cut metal, I set the flue in place to gauge how far above the roof the top will be. It's supposed to be at least 12" above the highest part of the roof, so this was a bit much:
After peeling off the protective coating and test-fitting the insulated pipe.
About 8" needed to be trimmed off. I started with a hacksaw, which would have taken all day and killed my arm. Switched up to reciprocating saw, which shook the whole pipe too violently to make a good cut. Finally settled on my cut-off tool.
In place. Much better. It's about 14" up now, but dad thought it would be fine.
From the inside, with insulated pipe in place:
Flashing and boot installed. We just need to attach the roof brackets and seal the outside up.
Since we don't have the sealant yet (I'm overnighting it through Amazon), tomorrow will probably mostly be cutting and installing wall panels, etc. Plus I have a lunch date with a friend, so I'll be finishing up a little earlier.
It's starting to look like a home! From the outside, anyway...